front page debut pictures partners prices, order form contact

REFERENCES:

Heater cable setup, mistake place measurements

Borsodchem co. Kazincbarcika, MDI cooled container in barrel floor the planning of the works of electric heating and his implementation.
2x900 M2 floor-space cold storage plant heating a floor tackling with twofold safety.
Customer: K--AR Építész Stúdió KFT.
71 Szabadság square, Hódmezővásárhely

Miskolc Hollóstető Gyertyán Panzió channel the planning of heating his foundation
80 fm* the frostless of a channel, automatics with a control
Customer: MIKEROBB Kft.
21 Győri kapu, Miskolc.

Budapest CAMPONA shopping centre for the heating of passages the measurement of mistake place, his correction

Budapest Erzsébet square deep garage driving ramp heating the measurement of mistake place, his correction.

Auchan department stores Albertfalva and Old Buda ramp heatings the measurement of mistake place, his correction

Hejőkürt LIDL logistic depository refrigerator door underfloor heating the measurement of mistake place, his correction

Budaörs Városháza car driving and space casing heatings the measurement of mistake place, his correction

Esztergom experience bath HAMMAM Turkish bath bench heating the measurement of a cable mistake, his correction
Customer: ALBATROS Kft.
1225 Budapests, Bányalég u 94.

Dunakeszi Duna residential area for the going up heating of a car the measurement of mistake place, the setup of new road heating.

The management of construction works

Esztergom Bazilika the foundation of ornament lighting
Customer and designer: Lisys Rt.
Implementation: Tessag Hungária Ltd. the leader of an implementation the field management of the work.
Took a part in the work: Tessag Hungária a Ltd. employees
TELVILL is a Ltd.



VÁRIBEL KFT.3533 Miskolc, Szervezet utca 43. Mobil: 70/212-3110Tel./Fax: 46/402-570 Email: info@varibel.hu